Qingdao Tianxing Cable: What is the construction process of the cable

Source : Tianxing Cable | Release date : 2024-05-04
The construction process of cable generally includes the following steps:

1. Preliminary preparation: the preparatory work before construction, including understanding the specific requirements and design scheme of the project, determining the path of cable laying and the location of cable channels, formulating detailed construction schemes, and obtaining the relevant construction permits. At the same time, it is necessary to prepare the required construction materials and equipment, such as cables, cable shafts, rollers, maintenance materials, etc.

2. Site investigation and survey: survey and survey work on the construction site, including surveying the topography, determining the soil quality and foundation conditions, and identifying the situation of underground pipelines and other facilities. This information will help determine the appropriate path and manner of laying the cable.

3. Path and channel construction: According to the survey results and design scheme, the path and channel construction work. This includes digging cable ditches or tunnels, installing cable brackets or Bridges, etc. In the construction process, it is necessary to pay attention to the protection of underground pipelines and other facilities to ensure the safety and quality of construction.

4. Cable laying: Lay the cable on the bracket or bridge according to the design requirements and the path. During the laying process, it is necessary to avoid excessive bending, stretching or extrusion of the cable, so as not to affect its internal structure and performance. At the same time, it is also necessary to ensure that the cable is fixed and protected properly to prevent it from being affected by mechanical damage or the external environment.

5. Accessories installation and connection: Install accessories on cables and connect them according to actual needs. This includes the installation of fittings, terminal heads, branch boxes and other equipment, and the corresponding electrical connection and testing work. During installation and connection, you must comply with relevant specifications and requirements to ensure connection quality and reliability.

6. Test acceptance: After the completion of cable construction, the test acceptance work is carried out. This includes testing and checking the insulation performance, electrical conductivity and grounding performance of the cable to ensure that the indicators meet the design requirements and relevant national standards. At the same time, it is also necessary to clean and restore the construction site to ensure that the environment is clean and safe.

It should be noted that in each construction link, it is necessary to strictly abide by the safety operation procedures and relevant regulations to ensure the safety and quality of the construction process. At the same time, it is also necessary to flexibly adjust the construction scheme and measures according to the actual situation to adapt to different engineering needs and environmental conditions.

Qingdao Tianxing Cable Co., Ltd. focuses on the production of customized wire and cable manufacturers, main: fire wire and cable, power cable, control cable and other products, exported to more than 40 countries and regions around the world, the annual production capacity of 1 billion yuan. 6000 square meters of storage, standing hundreds of millions of inventory, order demand for rapid distribution and delivery, large prices more favorable.